The new section has been under construction for a few years, and is the new road for drivers traveling to the south of the municipality or to Cabo Corrientes.
It was the Ministry of Communications and Transportation (SCT) who finally gave the green light to the opening of the highway.
The new crossing replaces 450 meters of the original road, and is completely new, made of hydraulic concrete and with the signage typical of the federal highway.
Those traveling south must join the new road on the left side after passing the Garza Blanca overpass. Those driving north should enter the road to the right.